Difference between revisions of "GWR 813 Saddle Tank"

From SVR Wiki
Jump to: navigation, search
(drag box casting returned)
(Reassembly taking place)
Line 47: Line 47:
 
813 suffered from leaking boiler tubes during the 2021 [[Autumn Steam Gala]] and was withdrawn on the Friday of that event. A retube followed<ref>[https://www.svrlive.com/bloct21 Branch Lines, October 2021]</ref>.
 
813 suffered from leaking boiler tubes during the 2021 [[Autumn Steam Gala]] and was withdrawn on the Friday of that event. A retube followed<ref>[https://www.svrlive.com/bloct21 Branch Lines, October 2021]</ref>.
  
During the 2022 [[Spring Steam Gala]] 813 suffered a failure of the grey iron casting that forms part of the rear spring housing under the coal bunker. It was [[SVR-based locomotives visiting other events#Cancelled_appearances|unable to attend]] as planned the South Devon Railway 150 celebration, and a hire period at The Embsay and Bolton Abbey Railway. The failure required the casting to be removed at Bridgnorth and The Boro' Foundry at Lye, Stourbridge engaged to assist in producing a new pattern, make a new casting in spheroidal graphite iron, and machine it.<ref>SVR News 220</ref> The GWR 813 Fund Trustees launched a Crowdfunder appeal which raised around £2,250 of the estimated £15,000 cost.<ref>[https://www.national-preservation.com/threads/gwr-813-failure.1420980/page-3#post-2816098 National Preservation Forum] (retrieved 1 June 2023)</ref> {{As of |2024|1}} the drag-box casting has been returned to Bridgnorth, and awaits reassembly<ref>[https://www.svrlive.com/blfeb24 Branch Lines, February 2024]</ref>.  
+
During the 2022 [[Spring Steam Gala]] 813 suffered a failure of the grey iron casting that forms part of the rear spring housing under the coal bunker. It was [[SVR-based locomotives visiting other events#Cancelled_appearances|unable to attend]] as planned the South Devon Railway 150 celebration, and a hire period at The Embsay and Bolton Abbey Railway. The failure required the casting to be removed at Bridgnorth and The Boro' Foundry at Lye, Stourbridge engaged to assist in producing a new pattern, make a new casting in spheroidal graphite iron, and machine it.<ref>SVR News 220</ref> The GWR 813 Fund Trustees launched a Crowdfunder appeal which raised around £2,250 of the estimated £15,000 cost.<ref>[https://www.national-preservation.com/threads/gwr-813-failure.1420980/page-3#post-2816098 National Preservation Forum] (retrieved 1 June 2023)</ref> Reassembly took place at Bridgnorth in Spring 2024<ref>[https://www.svrlive.com/blmar24 Branch Lines, March 2024]</ref>.  
  
 
===Taffy nameplate===
 
===Taffy nameplate===

Revision as of 16:43, 15 March 2024

GWRGreat Western Railway 813 Saddle Tank
813 20161105.jpg
813 at Highley in November 2016
Built By Hudswell Clarke for Port Talbot Railway
Configuration 0-6-0ST
Status In Service
Loco Number 813
Other Numbers PTRPort Talbot Railway & Docks Company 26
12, NCBNational Coal Board 11
History
Built 1900
Type '
1967 Arrived on SVRSevern Valley Railway
1976 First steamed in preservation
1996 Overhaul begun at Bridgnorth
2000 Returned to steam
2009 Withdrawn for overhaul
2016 Re-entered service
Technical
Weight 44t
Tractive effort 17,410 lb
Pressure 160 lb/sq in

Steam Locomotives

813 is an 0-6-0 saddle tank locomotive built in 1900 by Hudswell Clarke for the Port Talbot Railway Company, which later became part of the GWRGreat Western Railway. It subsequently saw service at Backworth Colliery in Northumberland. The locomotive is owned by The GWR 813 Preservation Fund.

813 in main line service

The loco was originally built for the Port Talbot Railway & Docks Company (PTRPort Talbot Railway & Docks Company), one of nine 0-6-0 saddle tanks owned by that company. She was built by Hudswell Clarke of Leeds, works number 555 of 1900,[1] and entered service with the PTRPort Talbot Railway & Docks Company in 1901 as number 26. Based at Duffryn Yard Depot, the locomotive was predominantly used for hauling coal trains and shunting in colliery sidings on the PTRPort Talbot Railway & Docks Company's network.[2]

In 1908 the GWRGreat Western Railway agreed to operate the PTRPort Talbot Railway & Docks Company's trains and maintain their locos. As the PTRPort Talbot Railway & Docks Company was still legally independent their locos were not fully absorbed into the GWRGreat Western Railway stock list, but with the GWRGreat Western Railway responsible for maintenance number 26 started to receive GWRGreat Western Railway standard parts to replace those originally fitted by Hudswell Clarke. The GWRGreat Western Railway took over the PTRPort Talbot Railway & Docks Company completely in 1922, and shortly afterwards 26 went to Swindon for overhaul, returning in 1924 as number 813. With the GWRGreat Western Railway keen to phase out non-standard locos from its fleet, 813 was withdrawn and put up for sale in 1933.

813 in industrial service

After 9 months on the GWRGreat Western Railway sales list, 813 was sold to Robert Stephenson & Company, who sold her on to Backworth Collieries Limited in Northumberland. Backworth renumbered her as number 12 and she survived to be passed to the NCBNational Coal Board with the nationalisation of the coal industry in 1947. In 1950, she received a new boiler from her original manufacturers Hudswell Clarke, and was renumbered as NCBNational Coal Board 11. A new firebox followed in 1962, only five years before the NCBNational Coal Board withdrew her from service.

813 in preservation

The loco arrived on the SVRSevern Valley Railway on the 25th November 1967. Following cosmetic restoration she appeared as a static exhibit at Rail 150 in 1975, and briefly returned to steam in 1976. However it was quickly found that further restoration work was required. The loco was able to steam again in 1984, and visited Didcot as part of the GW150 celebrations, but again suffered from mechanical problems and was taken out of service. The loco was stored out of use until 1996, before undergoing a thorough overhaul and rebuilding at Bridgnorth. She successfully returned to steam in summer 2000. Despite her small size, she was pressed straight into service on the SVRSevern Valley Railway due to a temporary loco shortage.

After returning to steam, 813 visited a large number of other railways around the UK before being withdrawn in 2009 for her next major overhaul at Bridgnorth Loco Works. This was completed by August 2016 and, after test runs, 813 was moved to Kidderminster for painting in September,[3] and to Bridgnorth on 8 October for signwriting.[4] The locomotive then featured in the Season Finale Gala held over the first weekend of November 2016.

At the end of 2019, 813 had recorded a total of 17,269 miles in preservation on the SVRSevern Valley Railway. The reported total may include mileage on hire to other railways[5].

813 suffered from leaking boiler tubes during the 2021 Autumn Steam Gala and was withdrawn on the Friday of that event. A retube followed[6].

During the 2022 Spring Steam Gala 813 suffered a failure of the grey iron casting that forms part of the rear spring housing under the coal bunker. It was unable to attend as planned the South Devon Railway 150 celebration, and a hire period at The Embsay and Bolton Abbey Railway. The failure required the casting to be removed at Bridgnorth and The Boro' Foundry at Lye, Stourbridge engaged to assist in producing a new pattern, make a new casting in spheroidal graphite iron, and machine it.[7] The GWRGreat Western Railway 813 Fund Trustees launched a Crowdfunder appeal which raised around £2,250 of the estimated £15,000 cost.[8] Reassembly took place at Bridgnorth in Spring 2024[9].

Taffy nameplate

Around 2000 the locomotive carried wooden 'Taffy' nameplates[10].

Gallery

See also

Steam Locomotives
SVR-based locomotives visiting other events

References

  1. UKLocos database
  2. SVRSevern Valley Railway News 174
  3. SVR Online Forum
  4. GWR 813 Fund 'In Steam 2016'
  5. SVRSevern Valley Railway News 210, SVRSevern Valley Railway-based Steam Locomotive Mileage 2017-2019, Duncan Ballard
  6. Branch Lines, October 2021
  7. SVRSevern Valley Railway News 220
  8. National Preservation Forum (retrieved 1 June 2023)
  9. Branch Lines, March 2024
  10. Dave Hill photograph of 813 at Highley on 2 September 2000 posted on Facebook, 4 May 2020 (Retrieved 4 May 2020)

Links

Loco history page on GWR 813 Preservation Fund website

Navigation menu

SVR Wiki

Main Page

From SVR Wiki
Jump to: navigation, search

Welcome to the Severn Valley Railway Wiki

From this week's featured article
Eardington is situated on Eardington Bank, mid-way between Bridgnorth and Hampton Loade. In recent years, rebuilding the platform was completed in 2019 and the water tower was dismantled in 2021. Although the station no longer features in daily operations, it resumed use during gala events in 2023 more than 40 years since regular timetabled trains ceased. (Full article...)
Schematic Map of the SVRSevern Valley Railway
BridgnorthEardingtonHampton LoadeCountry Park HaltHighleyThe Engine HouseArleyVictoria BridgeNorthwood HaltWyre Forest LineBewdleyStourport BranchBewdley TunnelConnection to Network RailKidderminsterMaps#Schematic maps of the pre-closure SVRMapandlinks3.png
Click on the map for a
larger interactive version

For 101 years between 1862 and 1963, the Severn Valley Railway formed part of the national railway network, running for 40 miles between Hartlebury and Shrewsbury. Established as a separate company, it was mainly operated by the Great Western Railway (GWRGreat Western Railway) and later by British Railways (BRBritish Rail or British Railways).

The present day Severn Valley Railway (SVRSevern Valley Railway) was established in 1965 to preserve part of the line as a heritage railway. Today it has six stations and two halts and runs for 16 miles along the Severn Valley between Bridgnorth in Shropshire and Kidderminster in Worcestershire, following the course of the River Severn for much of its route. Operations involve a mixture of steam and heritage diesel-hauled services.

This unofficial website is a project aimed to collect information and record events relating to the SVRSevern Valley Railway, both past and present.

For timetables, fare information, and news about special events, please visit the SVR Official Website. Other news and information of interest to members, shareholders and enthusiasts can be found on SVRLive.

In April 2023 the SVRSevern Valley Railway announced the launch of a Survival Fund to enable it to overcome the current financial crisis and implement longer-term plans for its future. Information and details of how to donate may be found on the SVRSevern Valley Railway's Survival Fund page.

Categories of article

History of the Severn Valley Railway

Current events on the SVRSevern Valley Railway

Information about the SVRSevern Valley Railway

Miscellaneous


Query Corner

Unsurprisingly, there are a large number of questions about the SVRSevern Valley Railway, both in pre-preservation days and for a number of historical items since then. Take a visit down to Query Corner to see if you have a recollection relating to some long forgotten event, or know of a reliable source (maybe an early edition of the SVR News?) that might have the information we need!

In addition are a number of stub articles requiring further input.

Adding to this Wiki

This site, or "wiki", is a collaborative effort, and anyone who has any knowledge relating to the SVRSevern Valley Railway should feel free to contribute. Once you have created a user account and logged in, you can modify any page by clicking the "Edit" button in the top right hand corner. For some tips on how to format pages, and some guidelines on how to make this wiki accessible can be found on Tips for contributing to the SVR Wiki.

Alternatively, if you don't feel confident editing this Wiki (although there is no reason you shouldn't!!), each article also has a "Discussion" page, which can be accessed by clicking the relevant button in the top left hand corner. This allows you to make additions, suggestions, or corrections to a page without making any change to the article itself.


Navigation menu