From the opening of Kidderminster in July 1984, the connections to Platform 1 were controlled by a ground frame, which was unlocked by the Bewdley South-Kidderminster staff. The 6-lever ground frame was built using parts of the lever frame from the old Stourport signal box[1].

The points at the far end of Platform 1 were controlled independently of the ground frame, while the frame itself controlled the points to Platform 1/1 Engine Line and the catch points in 1EL (the run round loop), the connection to BRBritish Rail or British Railways and the sidings[2].

The ground frame was only intended as a temporary measure until the construction of a new signal box could take place. The new signal box was commissioned on 21 November 1987, which is thought to be when the ground frame was taken out of use.

References

  • "Kidderminster". Signal box profile on the Severn Valley Railway S&TSignals & Telegraph Department (unofficial) website. Link. Accessed 10/01/2015.
  • Discussion on the Unofficial Severn Valley Railway Facebook group. Link. Dated 10/01/2015.
  1. SVRSevern Valley Railway News 70
  2. SVRSevern Valley Railway News 73