Difference between revisions of "October 20"
From SVR Wiki
m (add picture) |
|||
Line 1: | Line 1: | ||
[[File: Bewdley_Tunnel_1910.jpg|thumb|300px|right|Bewdley Tunnel being re-lined in 1910]]On {{PAGENAME}} in SVR history. | [[File: Bewdley_Tunnel_1910.jpg|thumb|300px|right|Bewdley Tunnel being re-lined in 1910]]On {{PAGENAME}} in SVR history. | ||
− | *1910 Work on relining [[Bewdley Tunnel]] was completed. | + | *1910 Work on relining [[Bewdley Tunnel]] was completed.<ref>SVR News 109</ref> |
+ | *1990 [[The LNER (SVR) Coach Fund]] held a sponsored walk from Bridgnorth to Ironbridge, following the former track bed for most of the route<ref>SVR News 98</ref>. | ||
+ | |||
==See also== | ==See also== | ||
{{On this day see also}} | {{On this day see also}} | ||
+ | ==References== | ||
+ | <references /> | ||
[[Category:On this day in October]] | [[Category:On this day in October]] |
Revision as of 15:08, 15 October 2018
On October 20 in SVRSevern Valley Railway history.- 1910 Work on relining Bewdley Tunnel was completed.[1]
- 1990 The LNER (SVR) Coach Fund held a sponsored walk from Bridgnorth to Ironbridge, following the former track bed for most of the route[2].
See also
On this day in SVRSevern Valley Railway history