Difference between revisions of "November 10"

From SVR Wiki
Jump to: navigation, search
(6634)
m (add picture)
Line 1: Line 1:
On {{PAGENAME}} in SVR history.
+
[[File:GWR 6634 20171108.jpg|thumb|300px|right|6634 awaiting collection in November 2017]]On {{PAGENAME}} in SVR history.
  
 
*[[Severn Valley Railway Timeline 1990-1999#1997|1997]] The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in [[Kidderminster signal box]] was in progress at the same time.<ref>SVR News 126</ref>
 
*[[Severn Valley Railway Timeline 1990-1999#1997|1997]] The P-Way department began relaying the motor points at the north end of Kidderminster loop. Renewal work in [[Kidderminster signal box]] was in progress at the same time.<ref>SVR News 126</ref>

Revision as of 16:40, 10 November 2017

6634 awaiting collection in November 2017
On November 10 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← November 9 - November 11 →

References

  1. SVRSevern Valley Railway News 126