Difference between revisions of "December 9"

From SVR Wiki
Jump to: navigation, search
(Created page with "On {{PAGENAME}} in SVR history. *1931 BR brought a new 113 lever frame into use at Buildwas signal box in connection with the opening of Ironbridge power station....")
 
(Info added)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 
On {{PAGENAME}} in SVR history.
 
On {{PAGENAME}} in SVR history.
  
*1931 BR brought a new 113 lever frame into use at [[Buildwas]] signal box in connection with the opening of [[Ironbridge power station]].  
+
*[[List of signal boxes#Severn_Valley_Railway|1931]] GWR brought a new 113 lever frame into use at [[Buildwas]] signal box in connection with the opening of [[Ironbridge power station]].<ref>[[Bibliography#Books|Mitchell and Smith (2007)]] fig. 96.</ref>
 +
*1969 [[GWR 1116 Full Third]] arrived on the SVR, one of four vehicles from the Swindon test train purchased around that time.
 +
*1972 [[LMS 12992 Corridor Third]] arrived on the SVR from Plymouth.  
 
   
 
   
 
==See also==
 
==See also==
  
 
{{On this day see also}}
 
{{On this day see also}}
 +
==References==
 +
<references />
  
 
[[Category:On this day in December | December 09]]
 
[[Category:On this day in December | December 09]]

Latest revision as of 05:29, 25 November 2019

On December 9 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← December 8 - December 10 →

References

  1. Mitchell and Smith (2007) fig. 96.