October 12
From SVR Wiki
Revision as of 16:49, 18 August 2017 by Robin (talk | contribs) (Created page with "On {{PAGENAME}} in SVR history. *2009 The pre-fabricated sections of Highley Station Footbridge were lifted into place u...")
On October 12 in SVRSevern Valley Railway history.
- 2009 The pre-fabricated sections of Highley Station Footbridge were lifted into place using the 30 ton steam crane.
See also
On this day in SVRSevern Valley Railway history