Difference between revisions of "November 21"
From SVR Wiki
(Created page with "On {{PAGENAME}} in SVR history. *1987 The new Kidderminster signal box...") |
|||
Line 1: | Line 1: | ||
− | On {{PAGENAME}} in SVR history. | + | [[File:Kidderminster signal box.jpg |thumb|300px|right| Kidderminster Signal Box]]On {{PAGENAME}} in SVR history. |
− | *[[Severn Valley Railway Timeline 1980-1989#1987|1987]] The new [[Kidderminster Station signal box (1987 onwards)| Kidderminster signal box]] was commissioned. | + | *[[Severn Valley Railway Timeline 1980-1989#1987|1987]] The new [[Kidderminster Station signal box (1987 onwards)| Kidderminster signal box]] was commissioned.<ref>SVR News 87</ref> |
+ | *[[Severn Valley Railway Timeline 1980-1989#1988|1988]] Work began on the construction of [[Bridgnorth Loco Works#Boiler shop|Bridgnorth Boiler Shop]].<ref>SVR News 90</ref> | ||
==See also== | ==See also== | ||
{{On this day see also}} | {{On this day see also}} | ||
− | + | ==References== | |
+ | <references/> | ||
[[Category:On this day in November]] | [[Category:On this day in November]] |
Revision as of 17:22, 19 November 2017
On November 21 in SVRSevern Valley Railway history.- 1987 The new Kidderminster signal box was commissioned.[1]
- 1988 Work began on the construction of Bridgnorth Boiler Shop.[2]
See also
On this day in SVRSevern Valley Railway history