Difference between revisions of "March 24"

From SVR Wiki
Jump to: navigation, search
(Info added)
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
[[File:Highley Signal Box in 2013.jpg |thumb|200px|right| Highley Signal Box (Wikimedia Commons)]]On {{PAGENAME}} in SVR history.
 
[[File:Highley Signal Box in 2013.jpg |thumb|200px|right| Highley Signal Box (Wikimedia Commons)]]On {{PAGENAME}} in SVR history.
  
 +
*1973 [[GWR/BR 92090 Fruit D Van]] arrived on the SVR from Gloucester.
 
*[[Severn Valley Railway Timeline 1990-1999#1994|1994]] Work began to re-decorate the interior of [[Highley signal box]]. The job was completed during August.
 
*[[Severn Valley Railway Timeline 1990-1999#1994|1994]] Work began to re-decorate the interior of [[Highley signal box]]. The job was completed during August.
 +
*2001 [[BR Class 42 D821 Greyhound|D821 Greyhound]] appeared at Falmouth Docks as D821 Cornwall, where it was twinned with the Royal Navy ship.<ref>[http://www.westernchampion.co.uk/loco-d821-history-pres.php Diesel Traction Group] (Retrieved 10 March 2000)</ref>
 +
*2002 L&Y class 25 0-6-0 No. 957 (BR 52044) worked the 1.00 pm Kidderminster to Bridgnorth service, double headed with [[46443]].<ref>SVR News 140</ref> The test run followed a contract restoration which began in summer 1997.<ref>SVR News 122</ref>
 +
*2011 boiler SVR1 was dispatched to the Talyllyn Railway at Tywyn. This was the first new boiler to be completed by the SVR and the first boiler completed in Bridgnorth for nearly two hundred years. It was fitted to Talyllyn Railway No 2 Dolgoch<ref name=WRU0311>Express Points Web Round-Up, April 2011</ref>.
 +
 +
==Gallery==
 +
Photos taken on 24 March:
 +
<gallery>
 +
Dunrobin_20120324.jpg | 2012: [[Sharp Stewart 0-4-4T Dunrobin]] in Bridgnorth works
 +
</gallery>
 +
 
==See also==
 
==See also==
  
 
{{On this day see also}}
 
{{On this day see also}}
 +
==References==
 +
<references/>
  
 
[[Category:On this day in March]]
 
[[Category:On this day in March]]

Latest revision as of 03:46, 18 March 2020

Highley Signal Box (Wikimedia Commons)
On March 24 in SVRSevern Valley Railway history.
  • 1973 GWR/BR 92090 Fruit D Van arrived on the SVRSevern Valley Railway from Gloucester.
  • 1994 Work began to re-decorate the interior of Highley signal box. The job was completed during August.
  • 2001 D821 Greyhound appeared at Falmouth Docks as D821 Cornwall, where it was twinned with the Royal Navy ship.[1]
  • 2002 L&Y class 25 0-6-0 No. 957 (BRBritish Rail or British Railways 52044) worked the 1.00 pm Kidderminster to Bridgnorth service, double headed with 46443.[2] The test run followed a contract restoration which began in summer 1997.[3]
  • 2011 boiler SVR1 was dispatched to the Talyllyn Railway at Tywyn. This was the first new boiler to be completed by the SVRSevern Valley Railway and the first boiler completed in Bridgnorth for nearly two hundred years. It was fitted to Talyllyn Railway No 2 Dolgoch[4].

Gallery

Photos taken on 24 March:

See also

On this day in SVRSevern Valley Railway history

← March 23 - March 25 →

References

  1. Diesel Traction Group (Retrieved 10 March 2000)
  2. SVRSevern Valley Railway News 140
  3. SVRSevern Valley Railway News 122
  4. Express Points Web Round-UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR), April 2011