Difference between revisions of "March 24"
From SVR Wiki
m (add pictures etc) |
|||
Line 2: | Line 2: | ||
*[[Severn Valley Railway Timeline 1990-1999#1994|1994]] Work began to re-decorate the interior of [[Highley signal box]]. The job was completed during August. | *[[Severn Valley Railway Timeline 1990-1999#1994|1994]] Work began to re-decorate the interior of [[Highley signal box]]. The job was completed during August. | ||
+ | |||
+ | ==Gallery== | ||
+ | Photos taken on 24 March: | ||
+ | <gallery> | ||
+ | Dunrobin_20120324.jpg | 2012: [[Sharp Stewart 0-4-4T Dunrobin]] in Bridgnorth works | ||
+ | </gallery> | ||
+ | |||
==See also== | ==See also== | ||
Revision as of 22:40, 18 March 2018
On March 24 in SVRSevern Valley Railway history.- 1994 Work began to re-decorate the interior of Highley signal box. The job was completed during August.
Gallery
Photos taken on 24 March:
2012: Sharp Stewart 0-4-4T Dunrobin in Bridgnorth works
See also
On this day in SVRSevern Valley Railway history