Difference between revisions of "February 11"
From SVR Wiki
(Created page with "thumb|300px|right|Bewdley Tunnel looking towards KidderminsterOn {{PAGENAME}} in SVR history. *Severn Valley Railway Timeline 2010-201...") |
|||
Line 1: | Line 1: | ||
[[File:Bewdley_Tunnel_20150528.jpg |thumb|300px|right|Bewdley Tunnel looking towards Kidderminster]]On {{PAGENAME}} in SVR history. | [[File:Bewdley_Tunnel_20150528.jpg |thumb|300px|right|Bewdley Tunnel looking towards Kidderminster]]On {{PAGENAME}} in SVR history. | ||
+ | *2004 Following a major overhaul, [[5164|Large Prairie 5164]] moved under her own power for the first time in more than 20 years.<ref>SVR News 146/147</ref> | ||
*[[Severn Valley Railway Timeline 2010-2019#2012|2012]] Following six weeks of work to install new drainage and track in and adjacent to [[Bewdley Tunnel]], the line re-opened between Kidderminster and Bewdley. | *[[Severn Valley Railway Timeline 2010-2019#2012|2012]] Following six weeks of work to install new drainage and track in and adjacent to [[Bewdley Tunnel]], the line re-opened between Kidderminster and Bewdley. | ||
==See also== | ==See also== | ||
{{On this day see also}} | {{On this day see also}} | ||
+ | ==References== | ||
+ | <references /> | ||
[[Category:On this day in February]] | [[Category:On this day in February]] |
Latest revision as of 16:40, 4 February 2018
On February 11 in SVRSevern Valley Railway history.- 2004 Following a major overhaul, Large Prairie 5164 moved under her own power for the first time in more than 20 years.[1]
- 2012 Following six weeks of work to install new drainage and track in and adjacent to Bewdley Tunnel, the line re-opened between Kidderminster and Bewdley.
See also
On this day in SVRSevern Valley Railway history
References
- ↑ SVRSevern Valley Railway News 146/147