Revision as of 14:10, 3 December 2017
This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2. Although both platforms were present at opening on 1 February 1862, the footbridge was added later, its construction being authorised by the GWRGreat Western Railway on 12 May 1887.[1]
The footbridge last underwent a major refurbishment in 2004, when it was taken down and moved to the boiler shop for shot-blasting and powder coating, supported by funds from the SVRSevern Valley Railway's arrangement with the West Bromwich Building Society. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.
As of February 2017[update] the station master is appealing for volunteers to repaint the bridge.
See also
Towards Kidderminster
List of infrastructure
Bridgnorth Station
West Bromwich Building Society
References
- ↑ Marshall (1989) p. 104.