Difference between revisions of "August 3"

From SVR Wiki
Jump to: navigation, search
(Created page with "On {{PAGENAME}} in SVR history. *1882 The GWR authorised the building of a second platform, passing loop and extra sidings at Arley, including a signal box. *1882 The GWR...")
(No difference)

Revision as of 16:42, 4 July 2017

On August 3 in SVRSevern Valley Railway history.

  • 1882 The GWRGreat Western Railway authorised the building of a second platform, passing loop and extra sidings at Arley, including a signal box.
  • 1882 The GWRGreat Western Railway authorised the building of a second platform and passing loop at Hampton Loade.

See also

On this day in SVRSevern Valley Railway history

← August 2 - August 4 →