Difference between revisions of "August 3"
From SVR Wiki
(Created page with "On {{PAGENAME}} in SVR history. *1882 The GWR authorised the building of a second platform, passing loop and extra sidings at Arley, including a signal box. *1882 The GWR...") |
(No difference)
|
Revision as of 16:42, 4 July 2017
On August 3 in SVRSevern Valley Railway history.
- 1882 The GWRGreat Western Railway authorised the building of a second platform, passing loop and extra sidings at Arley, including a signal box.
- 1882 The GWRGreat Western Railway authorised the building of a second platform and passing loop at Hampton Loade.
See also
On this day in SVRSevern Valley Railway history