Difference between revisions of "September 16"
From SVR Wiki
m |
m (add pictures) |
||
Line 3: | Line 3: | ||
*1899 A short-lived siding was opened at [[Folly Point]] to serve the construction of the [[Elan Valley Aqueduct]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 95.</ref> | *1899 A short-lived siding was opened at [[Folly Point]] to serve the construction of the [[Elan Valley Aqueduct]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 95.</ref> | ||
*1973 [[43106]] was test steamed after nearly two years of restoration<ref>SVR News 29</ref>. | *1973 [[43106]] was test steamed after nearly two years of restoration<ref>SVR News 29</ref>. | ||
− | + | ==Gallery== | |
− | + | Photos taken on 16 September: | |
+ | <gallery> | ||
+ | 1997-7219 RJS SV 55.jpg| 1962: [[Eardington]], southbound ex-GWR Pannier 3788 with a passenger service | ||
+ | Eardington-DMU-1962-09-16.jpg| 1962: [[Eardington]], a BR DMU at the platform | ||
+ | Oldbury-Viaduct-DMU-1962-09-16.jpeg| 1962: [[Oldbury Viaduct]], View of a DMU on the viaduct | ||
+ | </gallery> | ||
+ | All pictures from the ([[Sellick Collection]]) | ||
==See also== | ==See also== | ||
Revision as of 15:58, 18 July 2019
On September 16 in SVRSevern Valley Railway history.- 1899 A short-lived siding was opened at Folly Point to serve the construction of the Elan Valley Aqueduct.[1]
- 1973 43106 was test steamed after nearly two years of restoration[2].
Gallery
Photos taken on 16 September:
1962: Eardington, southbound ex-GWRGreat Western Railway Pannier 3788 with a passenger service
1962: Eardington, a BRBritish Rail or British Railways DMUDiesel Multiple Unit at the platform
1962: Oldbury Viaduct, View of a DMUDiesel Multiple Unit on the viaduct
All pictures from the (Sellick Collection)
See also
On this day in SVRSevern Valley Railway history
← September 15 - September 17 →
References
- ↑ Marshall (1989) p. 95.
- ↑ SVRSevern Valley Railway News 29