Difference between revisions of "February 5"

From SVR Wiki
Jump to: navigation, search
(Created page with "On {{PAGENAME}} in SVR history. * 1989 Half a mile of track was being relaid in Alveley Woods. Newly restored Class 25 Fo...")
 
Line 1: Line 1:
 
On {{PAGENAME}} in SVR history.
 
On {{PAGENAME}} in SVR history.
  
*[[Severn Valley Railway Timeline 1980-1989#1989 | 1989]] Half a mile of track was being relaid in Alveley Woods. Newly restored Class 25 [[Former Residents#Diesel Locomotives|D7633]] was in charge of the works train.  
+
*1979 A contract for extending the [[Bridgnorth#The Railwayman's Arms|station bar and cellar at Bridgnorth]] was awarded to the building contractors.<ref>SVR News 51</ref>
 +
*1983 A 30ft deep hole was being dug at Hampton Loade to lay a pipe to carry a spring under the railway.<ref>SVR News 71</ref> 
 +
*[[Severn Valley Railway Timeline 1980-1989#1989 | 1989]] Half a mile of track was being relaid in Alveley Woods. Newly restored Class 25 [[Former Residents#Diesel Locomotives|D7633]] was in charge of the works train<ref>SVR  News 91</ref>.  
 
==See also==
 
==See also==
  
 
{{On this day see also}}
 
{{On this day see also}}
 +
==References==
 +
<references />
  
 
[[Category:On this day in February | February 05]]
 
[[Category:On this day in February | February 05]]

Revision as of 17:34, 29 January 2018

On February 5 in SVRSevern Valley Railway history.

  • 1979 A contract for extending the station bar and cellar at Bridgnorth was awarded to the building contractors.[1]
  • 1983 A 30ft deep hole was being dug at Hampton Loade to lay a pipe to carry a spring under the railway.[2]
  • 1989 Half a mile of track was being relaid in Alveley Woods. Newly restored Class 25 D7633 was in charge of the works train[3].

See also

On this day in SVRSevern Valley Railway history

← February 4 - February 6 →

References

  1. SVRSevern Valley Railway News 51
  2. SVRSevern Valley Railway News 71
  3. SVRSevern Valley Railway News 91