Changes

Jump to: navigation, search

List of signal boxes

562 bytes added, 21:50, 4 December 2015
additional info
| Mileage Siding G.F. || || || Two? lever G.F. providing access to siding at north end of Buildwas. Electrically released from S.B. <ref name="BuildwasDiagram" />
|-
| [[Cressage]] || By 1890, replaced June 1894 || 2 December 1963 || Replacement box GWR Type 5 brick signal box, 23 lever frame.<ref name="SRSSignalBoxRegister_Update9" />, (19 working, 4 spare), gate wheel for the level crossing<ref name = "Marshall131">[[Bibliography#Books | Marshall (1989)]], p131</ref>.
|-
| [[Berrington]] Cressage G.F. || By 1890, replaced June 1894 || 2 December 1963 || Original box reportedly able to switch outTwo lever G.F. Replacement box GWR Type 5 brick , locked from the signal box, 19 lever frame.to work the loop points and FPL at the north end of the station<ref name="SRSSignalBoxRegister_Update9Marshall131" />.
|-
| [[Berrington]] || By 1890, replaced June 1894 || 2 December 1963 || Original box reportedly able to switch out. Replacement box GWR Type 5 brick signal box, 19 lever frame<ref name="SRSSignalBoxRegister_Update9" />, (16 working, 3 spare)<ref name = "Marshall131" />.
|-
| Berrington G.F. || 1894 || 2 December 1963 || Two lever G.F., locked from the signal box, to work the loop points and FPL at the south end of the station<ref name = "Marshall131" />.
|-
 
| Burnt Mill Junction || Box ordered January 1894 || 14 February 1937 || 10 lever frame.<ref name="SRSSignalBoxRegister_Update9" /> End of short double track section from Sutton Bridge Jn
|-
Trustworthy, administrator
12,002
edits

Navigation menu