Difference between revisions of "Highley Station Footbridge"
From SVR Wiki
m (add picture of original footbridge) |
(add category) |
||
Line 7: | Line 7: | ||
[[List of infrastructure]]<br> | [[List of infrastructure]]<br> | ||
[[Highley Station foot crossing | Towards Bridgnorth]] | [[Highley Station foot crossing | Towards Bridgnorth]] | ||
+ | |||
+ | [[Category:Featured articles]] |
Revision as of 08:28, 26 December 2016
Highley Station Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year. It replaced a longer footbridge on the same site which was deemed beyond economical repair and demolished for scrap in spring 1974. The design and painting of the new footbridge was intended to mimic the original.
See also
Towards Kidderminster
List of infrastructure
Towards Bridgnorth