Difference between revisions of "February 5"

From SVR Wiki
Jump to: navigation, search
m (edit link)
Line 3: Line 3:
 
*1979 A contract for extending the [[Bridgnorth#The Railwayman's Arms|station bar and cellar at Bridgnorth]] was awarded to the building contractors.<ref>SVR News 51</ref>
 
*1979 A contract for extending the [[Bridgnorth#The Railwayman's Arms|station bar and cellar at Bridgnorth]] was awarded to the building contractors.<ref>SVR News 51</ref>
 
*1983 A 30ft deep hole was being dug at Hampton Loade to lay a pipe to carry a spring under the railway.<ref>SVR News 71</ref>   
 
*1983 A 30ft deep hole was being dug at Hampton Loade to lay a pipe to carry a spring under the railway.<ref>SVR News 71</ref>   
*[[Severn Valley Railway Timeline 1980-1989#1989 | 1989]] Half a mile of track was being relaid in Alveley Woods. Newly restored Class 25 [[Former Residents#Diesel Locomotives|D7633]] was in charge of the works train<ref>SVR  News 91</ref>.  
+
*[[Severn Valley Railway Timeline 1980-1989#1989 | 1989]] Half a mile of track was being relaid in Alveley Woods. Newly restored [[BR Class 25 D7633|Class 25 Diesel D7633]] was in charge of the works train<ref>SVR  News 91</ref>.  
 
==See also==
 
==See also==
  

Revision as of 22:04, 7 February 2018

On February 5 in SVRSevern Valley Railway history.

  • 1979 A contract for extending the station bar and cellar at Bridgnorth was awarded to the building contractors.[1]
  • 1983 A 30ft deep hole was being dug at Hampton Loade to lay a pipe to carry a spring under the railway.[2]
  • 1989 Half a mile of track was being relaid in Alveley Woods. Newly restored Class 25 Diesel D7633 was in charge of the works train[3].

See also

On this day in SVRSevern Valley Railway history

← February 4 - February 6 →

References

  1. SVRSevern Valley Railway News 51
  2. SVRSevern Valley Railway News 71
  3. SVRSevern Valley Railway News 91