Difference between revisions of "May 8"
From SVR Wiki
m (Info added) |
m (Correct date for Cambrian railtour was 9th) |
||
Line 1: | Line 1: | ||
On {{PAGENAME}} in SVR history. | On {{PAGENAME}} in SVR history. | ||
− | *[[Dowles_Bridge#Closure | 1965]] Electric token working was withdrawn from the [[Wyre Forest Line]], marking the closure of the line to normal traffic | + | *[[Dowles_Bridge#Closure | 1965]] Electric token working was withdrawn from the [[Wyre Forest Line]], marking the closure of the line to normal traffic<ref>[[Bibliography#Books|Beddoes & Smith (1995)]] p. 196.</ref>. |
− | |||
==See also== | ==See also== |
Latest revision as of 09:52, 25 April 2020
On May 8 in SVRSevern Valley Railway history.
- 1965 Electric token working was withdrawn from the Wyre Forest Line, marking the closure of the line to normal traffic[1].
See also
On this day in SVRSevern Valley Railway history
References
- ↑ Beddoes & Smith (1995) p. 196.