Changes related to "Severn Valley Railway Timeline 2010-2019"

Jump to: navigation, search

This is a list of changes made recently to pages linked from a specified page (or to members of a specified category). Pages on your watchlist are bold.

Recent changes options
Legend:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes
Below are the changes since 17 June 2024, 18:58 (up to 50 shown).
Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Show minor edits | Hide bots | Hide anonymous users | Hide registered users | Hide my edits

Show new changes starting from 15:00, 26 June 2024
   
Page name:

24 June 2024

     17:14  Steam Locomotives visiting the SVR for galas‎ (diff | hist) . . (+396). . Moylesy391 (talk | contribs) (2024: 2999 and 45596 confirmed guests)

18 June 2024

     20:01  BR 3MT 82045‎ (diff | hist) . . (+814). . Robin (talk | contribs) (Progress: updated progress)
     16:07  Bridgnorth MPD‎ (diff | hist) . . (+169). . Robin (talk | contribs) (Graham Hill building vacated)
     16:00  Bridgnorth‎ (diff | hist) . . (+143). . Robin (talk | contribs) (Milestones: ESMP office occupied)
     15:05  Barry Railway Carriage 163‎ (diff | hist) . . (+112). . Robin (talk | contribs) (Barry Railway Carriage 163 in preservation: move completed)
     14:56  List of preservation groups‎ (diff | hist) . . (+4). . Robin (talk | contribs) (Reclassify Barry Railway Carriage Trust)
     14:16  Carriages‎ (diff | hist) . . (-222). . Robin (talk | contribs) (GWR (and constituents) Designed Coaches: 163 left)