Severn Valley Railway Timeline 1970-1979

23 bytes added, 10:40, 27 June 2019
m
Link added
Having left the SVR, Sir Gerald Nabarro died on 18 November 1973. He had suffered two stokes during 1972 and had recently retired from the House of Commons due to ill health.
In December 1973, [[WD 193 Shropshire|WD 193]] operated all the [[Christmas services|Santa services]].
The Great Marquess was steamed for the first time since arrival the previous year. With an axle weight in excess of 19 tons, it exceeded the limit of 17 tons 12 cwt in the SVR's Light Railway Order granted in May 1970. A condition of the locomotive's move to the SVR was that it could be used there once restored, so the locomotive was therefore stored while discussions took place over a possible transfer to another railway. In the meantime a program of work was underway to upgrade the line, including replacement of several bridges, to raise the permitted limit to a figure in excess of 20 tons. This upgrade was achieved in due course.
Trustworthy, administrator
6,862
edits

Navigation menu