SVR timetables

From SVR Wiki
Jump to: navigation, search
Level-crossing-without-barrier-or-gate-ahead.jpg Stub article This article is a stub. You can help svrwiki by expanding it.

This page includes images of published SVRSevern Valley Railway timetables since opening in 1970

1970 - 1973: Bridgnorth to Hampton Loade

1974 – 1984: Bridgnorth to Bewdley

The line opened as far as Highley in April 1974 while work was completed on replacing the underbridge south of the station. The full line to Bewdley opened in May 1974, although crossing at Arley was not possible until the UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) loop (the line nearest the station) was recommissioned in 1975.

1984 onwards: Bridgnorth to Kidderminster

A second version of the 1984 timetable was published with the opening of the full line to Kidderminster on 31 July 1984.

In 2007 the line was closed by the storm damage in June. A limited service operated at the start of 2008 with full line services resuming at Easter, coinciding with the opening of The Engine House.


See also