Difference between revisions of "May 18"
From SVR Wiki
(Make it a proper page) |
(add info) |
||
Line 2: | Line 2: | ||
*[[Severn_Valley_Railway_Timeline_1980-1989 | 1983]] The line reopened following a closure caused by an embankment collapse south of [[Bridgnorth Bypass Bridge]] on April 30th. | *[[Severn_Valley_Railway_Timeline_1980-1989 | 1983]] The line reopened following a closure caused by an embankment collapse south of [[Bridgnorth Bypass Bridge]] on April 30th. | ||
+ | *2004 [[Bridgnorth Station Footbridge]] re-opened after dismantling for painting. | ||
==See also== | ==See also== |
Revision as of 20:24, 17 May 2017
On May 18 in SVRSevern Valley Railway history.
- 1983 The line reopened following a closure caused by an embankment collapse south of Bridgnorth Bypass Bridge on April 30th.
- 2004 Bridgnorth Station Footbridge re-opened after dismantling for painting.