Difference between revisions of "Stourport Branch"

From SVR Wiki
Jump to: navigation, search
Line 1: Line 1:
The short length of remaining track is now used as a siding. This line was the original connection of the Severn Valley line to the main at Hartlebury. There was an intermediate halt on the branch, just beyond the tunnel at Burlish.
+
The short length of remaining track is now used as a siding. This was the originally built connection of the Severn Valley line to the main line at [[Hartlebury]]. There was an intermediate halt on the branch between [[Bewdley]] and [[Stourport]], just beyond the tunnel at [[Burlish]].

Revision as of 16:56, 24 January 2015

The short length of remaining track is now used as a siding. This was the originally built connection of the Severn Valley line to the main line at Hartlebury. There was an intermediate halt on the branch between Bewdley and Stourport, just beyond the tunnel at Burlish.