Difference between revisions of "Stourport Branch"

From SVR Wiki
Jump to: navigation, search
m (Fix Burlish link)
Line 1: Line 1:
 
The short length of remaining track is now used as a siding. This was the originally built connection of the Severn Valley line to the main line at [[Hartlebury]]. The [[Kidderminster]] to [[Bewdley]] line followed some years later.
 
The short length of remaining track is now used as a siding. This was the originally built connection of the Severn Valley line to the main line at [[Hartlebury]]. The [[Kidderminster]] to [[Bewdley]] line followed some years later.
  
There was an intermediate halt on the branch between Bewdley and [[Stourport]], just beyond the tunnel at [[Burlish]].
+
There was an intermediate halt on the branch between Bewdley and [[Stourport]], just beyond the tunnel at [[Burlish Halt|Burlish]].

Revision as of 20:06, 27 September 2015

The short length of remaining track is now used as a siding. This was the originally built connection of the Severn Valley line to the main line at Hartlebury. The Kidderminster to Bewdley line followed some years later.

There was an intermediate halt on the branch between Bewdley and Stourport, just beyond the tunnel at Burlish.