Difference between revisions of "March 6"

From SVR Wiki
Jump to: navigation, search
(Created page with "On {{PAGENAME}} in SVR history. *1947 The Shrewsbury to Hereford line was blocked by snow, with trains diverted via Kidderminster. 6963 Throwley Hall and 5045 Earl of Dudley...")
 
(Details added)
 
Line 1: Line 1:
 
On {{PAGENAME}} in SVR history.
 
On {{PAGENAME}} in SVR history.
  
*1947 The Shrewsbury to Hereford line was blocked by snow, with trains diverted via Kidderminster. 6963 Throwley Hall and 5045 Earl of Dudley were among the locomotives noted<ref>[[Bibliography#Books|Turley (2005)]] p. 115.</ref>.
+
*1926 [[GWR 4786 Full Third]] was completed at Swindon.
 +
*1947 The Shrewsbury to Hereford line was blocked by snow, with trains diverted via Kidderminster. 6963 Throwley Hall and 5045 Earl of Dudley were among the locomotives noted.<ref>[[Bibliography#Books|Turley (2005)]] p. 115.</ref>
 +
*1991 [[GWR 40841 Ballast Wagon]] arrived on the SVR from Cardiff.
 
   
 
   
 
==See also==
 
==See also==

Latest revision as of 13:01, 21 February 2020

On March 6 in SVRSevern Valley Railway history.

  • 1926 GWR 4786 Full Third was completed at Swindon.
  • 1947 The Shrewsbury to Hereford line was blocked by snow, with trains diverted via Kidderminster. 6963 Throwley Hall and 5045 Earl of Dudley were among the locomotives noted.[1]
  • 1991 GWR 40841 Ballast Wagon arrived on the SVRSevern Valley Railway from Cardiff.

See also

On this day in SVRSevern Valley Railway history

← March 5 - March 7 →

References

  1. Turley (2005) p. 115.