Difference between revisions of "March 2"

From SVR Wiki
Jump to: navigation, search
Line 3: Line 3:
 
*1974 [[Highley signal box]] was commissioned.<ref>SVR News 31</ref>
 
*1974 [[Highley signal box]] was commissioned.<ref>SVR News 31</ref>
 
*[[Severn Valley Railway Timeline 1980-1989#1985 | 1985]] [[75069|BR Standard 75069]]'s first main line outing in preservation appropriately featured a rail tour to Swindon, as the locomotive had been built there 30 years earlier<ref>SVR News 76</ref>.
 
*[[Severn Valley Railway Timeline 1980-1989#1985 | 1985]] [[75069|BR Standard 75069]]'s first main line outing in preservation appropriately featured a rail tour to Swindon, as the locomotive had been built there 30 years earlier<ref>SVR News 76</ref>.
*[[Severn Valley Railway Timeline 2010-2019#2013|2013]] [[Kidderminster Station signal box (1987 onwards)#2013 fire| Kidderminster signal box]] suffered a small fire in the roof<ref>[https://forum.svr-online.org.uk/viewtopic.php?t=2775&start=0&postdays=0&postorder=asc&highlight= SVR Forum]</ref>.
+
*[[Severn Valley Railway Timeline 2010-2019#2013|2013]] [[Kidderminster Station signal box (1987 onwards)#2013 fire| Kidderminster signal box]] suffered a small fire in the roof, with services terminating at Bewdley for most of the day.<ref>[https://forum.svr-online.org.uk/viewtopic.php?t=2775&start=0&postdays=0&postorder=asc&highlight= SVR Forum]</ref>.
 
   
 
   
 
==See also==
 
==See also==

Revision as of 17:05, 2 March 2018

Highley Signal Box
On March 2 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← March 1 - March 3 →

References

  1. SVRSevern Valley Railway News 31
  2. SVRSevern Valley Railway News 76
  3. SVR Forum