Difference between revisions of "List of stations"

From SVR Wiki
Jump to: navigation, search
(add station abbreviations used on SVR)
m (Current SVR stations: Birdgnorth is *not* known as "BN", despite several people continually using this incorrect abbreviation!)
Line 9: Line 9:
 
== Current SVR stations ==
 
== Current SVR stations ==
  
*[[Bridgnorth]] (BN)
+
*[[Bridgnorth]] (BH)
 
*[[Hampton Loade]] (HL)
 
*[[Hampton Loade]] (HL)
 
*[[Country Park Halt]]
 
*[[Country Park Halt]]
Line 26: Line 26:
 
*Arley to Bewdley: 3¾ miles
 
*Arley to Bewdley: 3¾ miles
 
*Bewdley to Kidderminster: 3½ miles
 
*Bewdley to Kidderminster: 3½ miles
 
  
 
== Historic SVR stations ==
 
== Historic SVR stations ==

Revision as of 20:45, 26 May 2015

The majority of the stations on the SVRSevern Valley Railway survive from GWRGreat Western Railway days and retain most of their original appearance.

The principal exception is the SVRSevern Valley Railway station at Kidderminster which opened in 1984 on the site of the former goods yard of the existing Kidderminster main line station. Featuring a newly-built station building in the turn-of-the-century style of a former GWRGreat Western Railway station at Ross-on-Wye, the SVRSevern Valley Railway station is officially named Kidderminster Town (in line with GWRGreat Western Railway custom of including “Town” in the name of the closer of two stations to a town, the SVRSevern Valley Railway station being around 50 yards closer to Kidderminster’s town centre than the main line station). However in everyday use on the SVRSevern Valley Railway, ‘Kidderminster’ would be taken to mean the SVRSevern Valley Railway’s station, and the same is true on this Wiki site unless otherwise stated.


Other exceptions are Northwood Halt, which features a replacement shelter, and Country Park Halt, which serves Alveley Country park and is entirely new, although it is located close to the original Alveley Halt.


Current SVRSevern Valley Railway stations

Letters shown in brackets are used to refer to stations in internal SVRSevern Valley Railway documents such as working timetables etc.

The SVRSevern Valley Railway in preservation is 16 miles long in total, the distances between the principal stations being:

  • Bridgnorth to Hampton Loade: 4½ miles
  • Hampton Loade to Highley: 2 miles
  • Highley to Arley: 2¼ miles
  • Arley to Bewdley: 3¾ miles
  • Bewdley to Kidderminster: 3½ miles

Historic SVRSevern Valley Railway stations