Difference between revisions of "July 22"
From SVR Wiki
m (typo) |
|||
Line 1: | Line 1: | ||
− | On {{PAGENAME}} in SVR history. | + | [[File:Footbridge outside Bridgnorth Station 20150411.jpg|thumb|300px|right|Hollybush Road Footbridge opened on 22 July 1994]]On {{PAGENAME}} in SVR history. |
− | *[[Severn Valley Railway Timeline 1990-1999#1994|1994]] The new [[Bridgnorth#Footbridge outside Bridgnorth Station|footbridge outside Bridgnorth Station]] was opened to the public. | + | *[[Severn Valley Railway Timeline 1990-1999#1994|1994]] The new [[Bridgnorth#Footbridge outside Bridgnorth Station|footbridge outside Bridgnorth Station]] was opened to the public.<ref>SVR News 114</ref> |
+ | *2001 The [[Hampton Loade|Hampton Loade Station]] Gala featured the SVR's first National Velocipede Rally<ref>SVR News 139</ref>. | ||
==See also== | ==See also== | ||
{{On this day see also}} | {{On this day see also}} | ||
+ | ==References== | ||
+ | <references /> | ||
[[Category:On this day in July]] | [[Category:On this day in July]] |
Revision as of 13:02, 16 July 2018
On July 22 in SVRSevern Valley Railway history.- 1994 The new footbridge outside Bridgnorth Station was opened to the public.[1]
- 2001 The Hampton Loade Station Gala featured the SVRSevern Valley Railway's first National Velocipede Rally[2].
See also
On this day in SVRSevern Valley Railway history