Difference between revisions of "Highley Station Footbridge"

From SVR Wiki
Jump to: navigation, search
(Page for Highley footbrige)
 
(Added mention of previous footbridge)
Line 1: Line 1:
Highley Station Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year.
+
Highley Station Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year. It replaced a longer footbridge on the same site which was demolished for scrap in the early 1970s.
  
 
==See also==
 
==See also==
 
[[List of infrastructure]]
 
[[List of infrastructure]]

Revision as of 08:13, 25 January 2015

Highley Station Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year. It replaced a longer footbridge on the same site which was demolished for scrap in the early 1970s.

See also

List of infrastructure