Difference between revisions of "Highley Station Footbridge"

From SVR Wiki
Jump to: navigation, search
(add more accurate date old footbridge demolition)
Line 1: Line 1:
[[Highley | Highley Station]] Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year. It replaced a longer footbridge on the same site which was deemed beyond economical repair and demolished for scrap in spring 1974.
+
[[Highley | Highley Station]] Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year. It replaced a longer footbridge on the same site which was deemed beyond economical repair and demolished for scrap in spring 1974. The design and painting of the new footbridge was intended to mimic the original.
  
 
==See also==
 
==See also==
 
[[List of infrastructure]]
 
[[List of infrastructure]]

Revision as of 09:36, 10 March 2015

Highley Station Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year. It replaced a longer footbridge on the same site which was deemed beyond economical repair and demolished for scrap in spring 1974. The design and painting of the new footbridge was intended to mimic the original.

See also

List of infrastructure