Difference between revisions of "Highley Station Footbridge"

From SVR Wiki
Jump to: navigation, search
(Added mention of previous footbridge)
(add more accurate date old footbridge demolition)
Line 1: Line 1:
Highley Station Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year. It replaced a longer footbridge on the same site which was demolished for scrap in the early 1970s.
+
[[Highley | Highley Station]] Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year. It replaced a longer footbridge on the same site which was deemed beyond economical repair and demolished for scrap in spring 1974.
  
 
==See also==
 
==See also==
 
[[List of infrastructure]]
 
[[List of infrastructure]]

Revision as of 22:02, 9 March 2015

Highley Station Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year. It replaced a longer footbridge on the same site which was deemed beyond economical repair and demolished for scrap in spring 1974.

See also

List of infrastructure