Falling Sands Viaduct (Bridge 3) was completed in 1877 as part of the [[Kidderminster Loop Line]]. It carries the railway across the [[Staffordshire & Worcestershire Canal]] Conservation Area and 64 feet above the River Stour, about a mile from [[Kidderminster]].  It is built of red brick and is 132 yards in length, with seven arches of 46ft span.<ref>[[Bibliography#Books|Marshall (1989)]] p. 92.</ref>
+
'''Falling Sands Viaduct''' (Bridge 3) was completed in 1877 as part of the [[Kidderminster Loop Line]]. It carries the railway across the [[Staffordshire & Worcestershire Canal]] Conservation Area and 64 feet above the River Stour, about a mile from [[Kidderminster]].  It is built of red brick and is 132 yards in length, with seven arches of 46ft span.<ref>[[Bibliography#Books|Marshall (1989)]] p. 92.</ref>
 
The Viaduct was also numbered as Bridge 3 during the BR era; the BR-era numbering plate, which may still be seen on the northern parapet, gives its location as [[Gradient profile and mileages#Mileages|135 miles 78 chains]].
 
The Viaduct was also numbered as Bridge 3 during the BR era; the BR-era numbering plate, which may still be seen on the northern parapet, gives its location as [[Gradient profile and mileages#Mileages|135 miles 78 chains]].
  
Line 13: Line 13:
 
The line between Foley Park and Kidderminster, including the Viaduct, was acquired from BR in 1984, with passenger services commencing on 30 July 1984.
 
The line between Foley Park and Kidderminster, including the Viaduct, was acquired from BR in 1984, with passenger services commencing on 30 July 1984.
  
==Prospective repairs==
+
==Repairs==
Extensive repairs are needed to secure the Viaduct. Water has seeped into the structure causing cracks and erosion, and there is a speed restriction in place.
+
By around 2015 it had been determined that extensive repairs were needed to secure the Viaduct. Water had seeped into the structure causing cracks and erosion, and a speed restriction became necessary.
  
 
===2016 HLF bid rejected===
 
===2016 HLF bid rejected===
Line 24: Line 24:
 
The Trust submitted its bid on 26 October 2018 and on 25 March 2019 announced the award of a further £853,800 grant from The [[:Category:Lottery funding#National_Lottery_Heritage_Fund|National Lottery Heritage Fund]] which together with the earlier grant took the total amount of its funding to £925,600. The grant, along with other funds raised, will be used to restore Falling Sands Viaduct and to launch an exciting programme of community engagement and exhibitions that will explore the Railway’s early history. In August 2019 the Trust unveiled a large donation wall at [[The Engine House]] acknowledging the individuals, organisations and businesses who had donated to the "Helping Hands for Falling Sands" appeal.
 
The Trust submitted its bid on 26 October 2018 and on 25 March 2019 announced the award of a further £853,800 grant from The [[:Category:Lottery funding#National_Lottery_Heritage_Fund|National Lottery Heritage Fund]] which together with the earlier grant took the total amount of its funding to £925,600. The grant, along with other funds raised, will be used to restore Falling Sands Viaduct and to launch an exciting programme of community engagement and exhibitions that will explore the Railway’s early history. In August 2019 the Trust unveiled a large donation wall at [[The Engine House]] acknowledging the individuals, organisations and businesses who had donated to the "Helping Hands for Falling Sands" appeal.
  
Repair work commenced in January 2020, to be fully completed by the autumn in two phases.<ref>[https://www.svr.co.uk/NewsItem.aspx?a=875 SVR website]</ref>. The first stage necessitated closure of the railway between Bewdley and Kidderminster from the end of [[Christmas services]]: works were essentially complete at the interruption of works in March by [[2020 coronavirus disease (COVID-19) pandemic|coronavirus disease (COVID-19)]], although track was not joined and signalling not yet in place. While the railway remained closed Phase 2 from May 2020 involved replacing damaged brickwork and corbelling, and repointing throughout.<ref>[http://svrtrust.org.uk/our-projects/falling-sands-viaduct.html 'Falling Sands Viaduct', Severn Valley Railway Charitable Trust website] (Retrieved 20 November 2018)</ref><ref>Shareholders' Newsletter, undated</ref><ref>SVR News 203, 204</ref><ref>[https://www.svrlive.com/epnovember18 Express Points November 2018]</ref>
+
===2019-20 repair work===
 +
The timing was chosen to make the most of the annual six week shutdown period, with the work to be fully completed by the autumn in two phases.<ref>[https://www.svr.co.uk/NewsItem.aspx?a=875 SVR website]</ref>. The first stage necessitated closure of the railway between Bewdley and Kidderminster from the end of [[Christmas services]] with the line reopening at Easter. Phase 2 from May 2020 would involve replacing damaged brickwork and corbelling, and repointing throughout.<ref>[http://svrtrust.org.uk/our-projects/falling-sands-viaduct.html 'Falling Sands Viaduct', Severn Valley Railway Charitable Trust website] (Retrieved 20 November 2018)</ref><ref>Shareholders' Newsletter, undated</ref><ref>SVR News 203, 204</ref><ref>[https://www.svrlive.com/epnovember18 Express Points November 2018]</ref>
 +
 
 +
Repair work began at the very end of December 2019 with the lifting of the track by a team of volunteers and paid staff. External contractors then removed the ballast and fill from the viaduct. After the infill was removed, the contractors improved the drainage channels and added a waterproof membrane, before putting everything back together. These works were essentially complete when interrupted in March by [[2020 coronavirus disease (COVID-19) pandemic|coronavirus disease (COVID-19)]], although track was not joined and signalling not yet in place.
 +
 
 +
While the railway remained closed, the contractors began work on stage 2. Easing of lockdown restrictions allowed work on stage 1 to restart in the week of 19 June, with laying of rail completed on 25 June. The following day [[BR Class 50 50035 Ark Royal]] became the first train to cross the viaduct since December while delivering S&T equipment for the new [[Ground Frames at Foley Park|Foley Park ground frame]].<ref>[https://www.svrlive.com/bljul20 Branch Lines, July 2020]</ref>
  
 
<gallery>
 
<gallery>
Line 31: Line 36:
  
 
== See also ==
 
== See also ==
[[Worcester Road Bridge | Towards Kidderminster]]<br>
+
*[[Worcester Road Bridge | Towards Kidderminster]]
[[List of infrastructure]]<br>
+
*[[List of infrastructure]]
[[Underbridge off Lisle Avenue | Towards Bridgnorth]]<br>
+
*[[Underbridge off Lisle Avenue | Towards Bridgnorth]]
[[Severn Valley Railway Charitable Trust Ltd]]  
+
*[[Severn Valley Railway Charitable Trust Ltd]]  
  
 
==References==
 
==References==
Line 40: Line 45:
  
 
==Links==
 
==Links==
[http://svrtrust.org.uk/ Charitable Trust website]<br>
+
*[http://svrtrust.org.uk/ Charitable Trust website]
[https://www.svrlive.com/charitable-trust SVRLive page]<br>
+
*[https://www.svrlive.com/charitable-trust SVRLive page]
[https://www.fallingsandsviaduct.org.uk/ Falling Sands Viaduct website]  
+
*[https://www.fallingsandsviaduct.org.uk/ Falling Sands Viaduct website]  
  
  
 
[[Category:Lottery funding]]
 
[[Category:Lottery funding]]
 
[[Category:Featured articles]]
 
[[Category:Featured articles]]

Revision as of 15:21, 6 July 2020

Falling Sands Viaduct (Geograph)

Falling Sands Viaduct (Bridge 3) was completed in 1877 as part of the Kidderminster Loop Line. It carries the railway across the Staffordshire & Worcestershire Canal Conservation Area and 64 feet above the River Stour, about a mile from Kidderminster. It is built of red brick and is 132 yards in length, with seven arches of 46ft span.[1] The Viaduct was also numbered as Bridge 3 during the BRBritish Rail or British Railways era; the BRBritish Rail or British Railways-era numbering plate, which may still be seen on the northern parapet, gives its location as 135 miles 78 chains.

Closure

Passenger services

The last scheduled passenger service over the Viaduct was the 19:20 DMUDiesel Multiple Unit from Bewdley to Kidderminster on Saturday 3 January 1970, with passenger services between being formally withdrawn from 5 January 1970.[2] When the SVRSevern Valley Railway acquired the southern section of the line between Alveley Sidings and Foley Park, the Viaduct remained in the section of the line still owned by BRBritish Rail or British Railways. Following the SVRSevern Valley Railway's reopening of Bewdley in 1974, BRBritish Rail or British Railways ran a number of summer weekend DMUDiesel Multiple Unit specials between their Kidderminster station and Bewdley. One of these was photographed on the Viaduct on 11 September 1982 during that year’s Enthusiasts Weekend.[3] The last passengers to cross the Viaduct under BRBritish Rail or British Railways ownership were on the “Severn Valley Enterprise” rail tour from Bewdley to Paddington and back on 8 October 1983.

Freight services

After crossing the viaduct when travelling toward Bewdley, the area of land on the left of the line was the site of the former British Sugar Corporation's Foley Park Factory. Freight services between the factory and Kidderminster continued after 1970, finally ending with the factory’s closure in late 1982.[4] The last visible structures on the site, two large silos, were demolished in 2012 and the area is now being developed for housing.

Preservation

The line between Foley Park and Kidderminster, including the Viaduct, was acquired from BRBritish Rail or British Railways in 1984, with passenger services commencing on 30 July 1984.

Repairs

By around 2015 it had been determined that extensive repairs were needed to secure the Viaduct. Water had seeped into the structure causing cracks and erosion, and a speed restriction became necessary.

2016 HLFHeritage Lottery Fund (National Lottery Heritage Fund from 2019) bid rejected

On 6 September 2016 the HLFHeritage Lottery Fund (National Lottery Heritage Fund from 2019) rejected a bid from the Severn Valley Railway Charitable Trust Ltd for £902,200 but "agreed the project as a medium priority for support" and "noted that a strengthened resubmission that addressed [its] concerns would be welcomed." The concerns were "that community engagement and interpretation plans were not sufficiently strong."[5]

2017-19 National Lottery Heritage Fund bid

In June 2017 the Trust secured £71,800 of HLFHeritage Lottery Fund (National Lottery Heritage Fund from 2019) financial backing to develop a bid seeking £927,000 from the HLFHeritage Lottery Fund (National Lottery Heritage Fund from 2019) for a large part of the quoted £1.324 million total project cost. The SVRSevern Valley Railway met the challenge of raising matched funding of £397,000 (originally £275,000) for which the Trust co-ordinated efforts through a campaign entitled "Helping hands for Falling Sands". Preliminary structural investigations in Summer 2018 had revealed two gas mains, one live, which increased the cost and SVRSevern Valley Railway's contribution.

The Trust submitted its bid on 26 October 2018 and on 25 March 2019 announced the award of a further £853,800 grant from The National Lottery Heritage Fund which together with the earlier grant took the total amount of its funding to £925,600. The grant, along with other funds raised, will be used to restore Falling Sands Viaduct and to launch an exciting programme of community engagement and exhibitions that will explore the Railway’s early history. In August 2019 the Trust unveiled a large donation wall at The Engine House acknowledging the individuals, organisations and businesses who had donated to the "Helping Hands for Falling Sands" appeal.

2019-20 repair work

The timing was chosen to make the most of the annual six week shutdown period, with the work to be fully completed by the autumn in two phases.[6]. The first stage necessitated closure of the railway between Bewdley and Kidderminster from the end of Christmas services with the line reopening at Easter. Phase 2 from May 2020 would involve replacing damaged brickwork and corbelling, and repointing throughout.[7][8][9][10]

Repair work began at the very end of December 2019 with the lifting of the track by a team of volunteers and paid staff. External contractors then removed the ballast and fill from the viaduct. After the infill was removed, the contractors improved the drainage channels and added a waterproof membrane, before putting everything back together. These works were essentially complete when interrupted in March by coronavirus disease (COVID-19), although track was not joined and signalling not yet in place.

While the railway remained closed, the contractors began work on stage 2. Easing of lockdown restrictions allowed work on stage 1 to restart in the week of 19 June, with laying of rail completed on 25 June. The following day BR Class 50 50035 Ark Royal became the first train to cross the viaduct since December while delivering S&TSignals & Telegraph equipment for the new Foley Park ground frame.[11]

See also

References

  1. Marshall (1989) p. 92.
  2. Marshall (1989) p. 164.
  3. SVRSevern Valley Railway News 66,67
  4. Railways in Worcestershire (retrieved 23 April 2018)
  5. Minutes - Heritage Lottery Fund: Committee for West Midlands Meeting on 6 September 2016
  6. SVR website
  7. 'Falling Sands Viaduct', Severn Valley Railway Charitable Trust website (Retrieved 20 November 2018)
  8. Shareholders' Newsletter, undated
  9. SVRSevern Valley Railway News 203, 204
  10. Express Points November 2018
  11. Branch Lines, July 2020

Links