Bridgnorth signal box

From SVR Wiki
Revision as of 22:21, 25 January 2015 by WillSalt (talk | contribs) (Added link to token working page)
Jump to: navigation, search

A signal box at Bridgnorth that works to Hampton Loade (short section) or Highley (long section) using ETT regulations. Bridgnorth has had a number of signal boxes during its existence. The masonary base of the current signal box was originally approximately 50% longer than it is today. Evidence of this truncation may be found by inspection of the brickwork towards the northern end on the front wall. The upper timber section was replaced by an ill-fitting one that was relocated from Pensnett during the earlier years of the SVRSevern Valley Railway.

Signalling diagram

Bridgnorth box diagram.gif

See Also