Difference between revisions of "Bridgnorth Station Footbridge"
From SVR Wiki
(create page for Bridgnorth Station Footbridge) |
m (Bridge number) |
||
Line 1: | Line 1: | ||
[[File:Station Footbridge - geograph.org.uk - 1374249.jpg|thumb|300px|right|Bridgnorth Station Footbridge (Wikimedia Commons)]] | [[File:Station Footbridge - geograph.org.uk - 1374249.jpg|thumb|300px|right|Bridgnorth Station Footbridge (Wikimedia Commons)]] | ||
− | This footbridge connects Bridgnorth Station's Platforms 1 and 2. It last underwent a major refurbishment in [[Severn Valley Railway Timeline 2000-2009#2004 | 2004]], when it was taken down and moved to the boiler shop for shot-blasting and repainting. A plaque on Platform 2 celebrates the re-opening on 18 May 2004. | + | This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2. It last underwent a major refurbishment in [[Severn Valley Railway Timeline 2000-2009#2004 | 2004]], when it was taken down and moved to the boiler shop for shot-blasting and repainting. A plaque on Platform 2 celebrates the re-opening on 18 May 2004. |
Revision as of 19:01, 11 June 2015
This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2. It last underwent a major refurbishment in 2004, when it was taken down and moved to the boiler shop for shot-blasting and repainting. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.
See also
Towards Kidderminster
List of infrastructure
Bridgnorth Station