Difference between revisions of "Bridgnorth Station Footbridge"

From SVR Wiki
Jump to: navigation, search
(create page for Bridgnorth Station Footbridge)
 
m (Bridge number)
Line 1: Line 1:
 
[[File:Station Footbridge - geograph.org.uk - 1374249.jpg|thumb|300px|right|Bridgnorth Station Footbridge (Wikimedia Commons)]]
 
[[File:Station Footbridge - geograph.org.uk - 1374249.jpg|thumb|300px|right|Bridgnorth Station Footbridge (Wikimedia Commons)]]
  
This footbridge connects Bridgnorth Station's Platforms 1 and 2.  It last underwent a major refurbishment in [[Severn Valley Railway Timeline 2000-2009#2004 | 2004]], when it was taken down and moved to the boiler shop for shot-blasting and repainting. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.
+
This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2.  It last underwent a major refurbishment in [[Severn Valley Railway Timeline 2000-2009#2004 | 2004]], when it was taken down and moved to the boiler shop for shot-blasting and repainting. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.
  
  

Revision as of 19:01, 11 June 2015

Bridgnorth Station Footbridge (Wikimedia Commons)

This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2. It last underwent a major refurbishment in 2004, when it was taken down and moved to the boiler shop for shot-blasting and repainting. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.


See also

Towards Kidderminster
List of infrastructure
Bridgnorth Station