Difference between revisions of "Bridgnorth Station Footbridge"

From SVR Wiki
Jump to: navigation, search
(Added details)
m (add picture)
Line 1: Line 1:
 
[[File:Station Footbridge - geograph.org.uk - 1374249.jpg|thumb|300px|right|Bridgnorth Station Footbridge (Wikimedia Commons)]]
 
[[File:Station Footbridge - geograph.org.uk - 1374249.jpg|thumb|300px|right|Bridgnorth Station Footbridge (Wikimedia Commons)]]
 +
[[File:Plaque_20150528.jpg|300px|right|2004 plaque]]
  
 
This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2.  It last underwent a major refurbishment in [[Severn Valley Railway Timeline 2000-2009#2004 | 2004]], when it was taken down and moved to the boiler shop for shot-blasting and powder coating, supported by funds from the SVR's arrangement with the [[West Bromwich Building Society]]. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.
 
This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2.  It last underwent a major refurbishment in [[Severn Valley Railway Timeline 2000-2009#2004 | 2004]], when it was taken down and moved to the boiler shop for shot-blasting and powder coating, supported by funds from the SVR's arrangement with the [[West Bromwich Building Society]]. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.

Revision as of 09:12, 18 February 2017

Bridgnorth Station Footbridge (Wikimedia Commons)
2004 plaque

This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2. It last underwent a major refurbishment in 2004, when it was taken down and moved to the boiler shop for shot-blasting and powder coating, supported by funds from the SVRSevern Valley Railway's arrangement with the West Bromwich Building Society. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.

As of February 2017 the station master is appealing for volunteers to repaint the bridge.


See also

Towards Kidderminster
List of infrastructure
Bridgnorth Station
West Bromwich Building Society