Difference between revisions of "Bridgnorth Station Footbridge"
From SVR Wiki
(Added details) |
m (add picture) |
||
Line 1: | Line 1: | ||
[[File:Station Footbridge - geograph.org.uk - 1374249.jpg|thumb|300px|right|Bridgnorth Station Footbridge (Wikimedia Commons)]] | [[File:Station Footbridge - geograph.org.uk - 1374249.jpg|thumb|300px|right|Bridgnorth Station Footbridge (Wikimedia Commons)]] | ||
+ | [[File:Plaque_20150528.jpg|300px|right|2004 plaque]] | ||
This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2. It last underwent a major refurbishment in [[Severn Valley Railway Timeline 2000-2009#2004 | 2004]], when it was taken down and moved to the boiler shop for shot-blasting and powder coating, supported by funds from the SVR's arrangement with the [[West Bromwich Building Society]]. A plaque on Platform 2 celebrates the re-opening on 18 May 2004. | This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2. It last underwent a major refurbishment in [[Severn Valley Railway Timeline 2000-2009#2004 | 2004]], when it was taken down and moved to the boiler shop for shot-blasting and powder coating, supported by funds from the SVR's arrangement with the [[West Bromwich Building Society]]. A plaque on Platform 2 celebrates the re-opening on 18 May 2004. |
Revision as of 09:12, 18 February 2017
This footbridge (Bridge 37) connects Bridgnorth Station's Platforms 1 and 2. It last underwent a major refurbishment in 2004, when it was taken down and moved to the boiler shop for shot-blasting and powder coating, supported by funds from the SVRSevern Valley Railway's arrangement with the West Bromwich Building Society. A plaque on Platform 2 celebrates the re-opening on 18 May 2004.
As of February 2017[update] the station master is appealing for volunteers to repaint the bridge.
See also
Towards Kidderminster
List of infrastructure
Bridgnorth Station
West Bromwich Building Society