Difference between revisions of "Acceptance Lever"

From SVR Wiki
Jump to: navigation, search
m (links)
Line 1: Line 1:
A method of operating a single line railway without the use of tokens or staffs. It relies on the section being [[Track Circuit]]ed throughout. Acceptance Lever working is used over the [[Bewdley South signal box|Bewdley South]] to [[Kidderminster signal box|Kidderminster]] single line section. It was first brought into use on 21 November 1987.
+
A method of operating a single line railway without the use of [[Single line working using tokens | tokens]] or staffs. It relies on the section being [[Track Circuit]]ed throughout. Acceptance Lever working is used over the [[Bewdley South signal box|Bewdley South]] to [[Kidderminster signal box|Kidderminster]] single line section. It was first brought into use on 21 November 1987.

Revision as of 13:20, 25 January 2015

A method of operating a single line railway without the use of tokens or staffs. It relies on the section being Track Circuited throughout. Acceptance Lever working is used over the Bewdley South to Kidderminster single line section. It was first brought into use on 21 November 1987.